Secretive Irish Climate Science Denier Group Steps Up 'Bizarre' Parliamentary Lobbying 22:27 Sep 27 0 comments EU Commission proposes new strict EU-wide rules on single-use plastics 12:29 May 29 0 comments Protecting WIldlife in Ireland from Hedge Cutting and Gorse Burning 23:37 Feb 23 0 comments WRECK THE « CLIMATE CHANCE » SUMMIT! At Nantes, France, from 26 to 28 September 2016 20:04 Jul 17 0 comments Why the corporate capture of COP21 means we must Kick Big Polluters Out of climate policy 22:47 Dec 03 3 comments more >>Blog Feeds
Public InquiryInterested in maladministration. Estd. 2005RTEs Sarah McInerney ? Fianna Fail?supporter? Anthony Joe Duffy is dishonest and untrustworthy Anthony Robert Watt complaint: Time for decision by SIPO Anthony RTE in breach of its own editorial principles Anthony Waiting for SIPO Anthony
Human Rights in IrelandPromoting Human Rights in Ireland
Lockdown Skeptics
Germany?s Economic and Political Suicide Fri Dec 27, 2024 17:00 | Tilak Doshi
Madeline Grant on Starmer?s Army and the Assisted Dying Debate Fri Dec 27, 2024 15:00 | Richard Eldred
FBI Found Evidence Covid Was Lab Leak But Was Not Allowed to Brief President Fri Dec 27, 2024 13:00 | Toby Young
Kemi or Nigel: Who is Right? Fri Dec 27, 2024 11:00 | Anonymous IT Reporter
The Pilots of Azerbaijan Airlines Flight 8243 Deserve Respect ? They Saved 29 Lives Fri Dec 27, 2024 09:00 | Ian Rons
Voltaire NetworkVoltaire, international editionVoltaire, International Newsletter N?113 Fri Dec 20, 2024 10:42 | en Pentagon could create a second Kurdish state Fri Dec 20, 2024 10:31 | en How Washington and Ankara Changed the Regime in Damascus , by Thierry Meyssan Tue Dec 17, 2024 06:58 | en Statement by President Bashar al-Assad on the Circumstances Leading to his Depar... Mon Dec 16, 2024 13:26 | en Voltaire, International Newsletter N?112 Fri Dec 13, 2024 15:34 | en |
Wind Turbine building at Rossport Solidarity Camp
mayo |
environment |
news report
Tuesday September 04, 2012 21:42 by C - RSC rossportsolidaritycamp at gmail dot com 085-1141170
From the 10th to 16th of August, Rossport Solidarity Camp hosted it's 3rd wind turbine building course. You can read a report of the first one here: http://www.indymedia.ie/article/95731. As the 3 previous turbines that were built are still going strong (and powering both the camp and camp house), this year it was decided to go for something bigger and more challenging. This year it's was decided to build a 4.2 metre turbine that is planned eventually to be connected to the grid at the house of a local Shell to Sea campaigner. The course which was originally scheduled to run from the 4th to the 10th August had to be delayed for 2 days after Shell go their TBM stuck, which as well as disrupting local traffic also disrupted the scheduling plans for the turbine course.. |
View Comments Titles Only
save preference
Comments (2 of 2)
Jump To Comment: 1 2..
Placing the magnet on the rotor disks
Adding the resin to make up the 2 rotor disks
Cleaning up the stator (which is made up of copper coils in resin)
..
The turbine frame on the tower head
Some finishing touches
Work also continued on a smaller turbine
Assembling the turbine for testing
Getting the blades balanced